Slovnaft Refinery Upgrade Project
Slovnaft Refinery Upgrade Project
Mol Hungarian Oil & Gas | Czech Republic
Challenge
Numerous pipes, pipe racks, water and steam vessels and two large silos required pipe freeze protection and temperature maintenance of 30°C.
Solution
nVent installed 2,500 meters of heat-tracing cables, multiple circuits, and associated controllers within an eight week timeline.